|
Minister inspects irrigation of Kantin Bilin Dam in Minhla Township

YANGON, 17 Jan—Minister for
Agriculture and Irrigation Maj-Gen Htay Oo, accompanied by departmental
officials, on 15 January, inspected cultivation of summer paddy, thriving of
gram plantations and irrigation facilities under construction at the irrigated
area of Kantin Bilin Dam in Minhla Township, Bago (West) Division.
The minister first inspected
irrigation of the dam through canal No 3 for summer paddy cultivation while
officials of the Irrigation Department reported on progress of work in
construction of other structures, irrigation, other structures under
construction. Afterwards, the minister looked into irrigation of canal No 3,
earth work being carried out with the use of machinery, irrigation of the main
canal.
With the use of those irrigation
facilities already completed, local farmers will be able to put more lands in
Minhla and Letpadan Townships under summer paddy and gram.
Next, the minister arrived at the
diversion weir of the dam where he was briefed by an official on the salient
points of the diversion weir. The minister viewed irrigation system of the
irrigated area of the dam, the diversion weir and the main canal.
Later, the minister inspected
water control tower, outlet conduit and spillway of the dam.
Kantin Bilin Dam with a storage
capacity of 134,000 acre feet is now storing 90,000 acre feet.
Next, the minister inspected land
preparations for cultivation of summer paddy, crop plantations and irrigation of
canals to farmlands. The dam will irrigate 12,000 acres of farmlands in 2005 and
it has been now able to irrigate 7,000 acres. Due to its emergence, there
appeared 2,300 irrigated acres between motor road and railroad and 4,700
irrigated acres in the lower part of railroad.

|