Services rendered by Engineering Department (Roads & Bridges), Yangon City Development Committee
Services rendered by Engineering Department (Roads & Bridges), Yangon City Development Committee
Yangon City Development Committee / April 19, 2018
2019- 2020 Financial Year
List of the rates for levying Taxes
Sr/ No |
Title |
Discription & Rate of Tax |
Amount (Kyat) |
Remarks |
1 |
Penalty for damages |
Five times of material and installation expenses shall be charged for the damage of road kerb stone, walking platform, center kerb and fencing, guard rail, road sign, traffic signal pole, steel wire barrier, bollard barrier, road decoration lamp post, traffic police shelter, bus shelter and related to road infrastructure.
|
|
|
2 |
Damage for the road right of way byunderground water piping, under ground cable |
1 Platform 2 Asphalt Concrete Road/ Surface 3 Cement Concrete Road/ Surface 4 Excavation 5 Pusher work at platform 6 Pusher work at asphalt concrete road 7 Pusher work at cement concrete road 8 Pusher work at shoulder or compacted natural road |
3450 Kyat / sqf 3500 Kyat / sqf 4000 Kyat / sqf 500 Kyat / sqf 3500 Kyat / sqf 4000 Kyat / sqf 5000 Kyat / sqf 1500 Kyat / sqf |
|
3 |
Temporary usage for Road area during water festival stage |
Large size of stage Medium size of stage |
70000 Kyat 50000 Kyat |
|
4 |
Shop rental fee |
To be collected by committee meeting minutes
|
|
|
5 |
Advertisement with vehicle |
Advertisement with vehicle fee will be collected by the following in 2019-2020 budget year. (A) Under 2 Ton Vehicle (B) 2 Ton to 3 Ton (C) Over 3 Ton |
8000 Kyat / month> 12000 Kyat / month 20000/ month |
96000 Kyat / Year 14400 Kyat / Year 240000 Kyat / Year |
6 |
Advertisement |
YCDC Administeration department shall collect the fee from 1.12.2020 and transfer to Road and Bridge Department title |
|
|
7 |
Temporary Road Pass Permit(Over 3 Ton vehicle) |
(A) 3000 Kg to 9000 Kg (B) 9000 Kg and Over |
7000 Kyat / month 7000 Kyat / day |
|
8 |
Penalty for Violation Vehicle |
YCDC Court No(2) shall charge and transfer to Road and Bridge account. |
||
9 |
Vehicle ingress / egress permit |
5000 Kyat/ running feet excluding platform & drain, infrastructure damage compensation. |
||
10 |
Toll Fee |
Along Kannar New Concrete Road (A) Heavy Vehicle 4000 Kyat / Day (B) Small Vehicle 1500 Kyat / Day |
||
11 |
Wheel Tax |
(A) 5000 Kyat / Year for Motor Cycle (B) 10000 Kyat / Year for tractors (trawlergyi) (C) 109500 Kyat / Year for Tractor and Trailor (D) 36500 Kyat / Year for Ambulance Vehicle (E) 36500 Kyat / Year for Death Body Transport Vehicle (F) Collection tor electric car by the following, |
||
|
|
(1) 1 Kilo Watt to 52.21 Kilo Watt (Under 600 CC) (2) 52.22 Kilo Watt to 67.89 Kilo Watt (600 CC to 1300 CC) (3) 67.9 Kilo Watt to 104.44 Kilo Watt (1301 CC to 2000 CC) (4) 104.45 Kilo Watt to 224.55 Kilo Watt (2001 CC to 4301 CC) (5) 224.56 Kilo Watt and Over (4301 CC and Over) |
Website Address