Services rendered by the Engineering Department (Water & Sanitation) Yangon City Development Committee


Yangon City Development Committee / April 25, 2018

Engineering Department(Water & Sanitation)

 

Implementation of a rapid system for Water Connection Permit Application

Application Procedures for Water Connection
  1. Applicant shall provide the address, where wants to install water connection, and contact telephone number in the prescribed application form at Township Water Resources and Water Supply Authority Office.
  2. Township Engineer will investigate the water availability of the applied address and notify within three days.
  3. If the water supply can be provided at the applied address, to apply water connection a case file including the official application form, 2 sets of drawing, a copy of applicant's registration card, a copy of the proof of ownership or the proof of residence shall be submitted to the Township Engineer.
  4. This case file is investigated by Township Engineer and the service charges, the cost of water meters, labour and material costs are calculated and paid at the township office.
  5. With the receipt of this payment, Township Engineer shall carry out to obtain the permit and a water meter at the Head Office.
  6. Three days after the payment has been made by the customer, the water meter has reached the township office to install water connection.
  7. The case file for applying for a water connection has been submitted from Township Office to District Office, and District Office to Head Office, to get approval. This approval can be received 10 days after the payment.

B.

Charges for Water Connection Permit Application

 

 

(1)       

Service Charges

 

 

 

(a)       

Permission for water connection (temporary/ final/ Existing Building) 

4000 MMK

 

 

(b)

Permission for Extra Water Connection

7500 MMK

 

 

(c)

Permission for Branch Water Connection

2000 MMK

 

 

(d)

Permission for Transfer of Water Connection

6000 MMK

 

 

(e)

Permission for electric water pump installation

(Ground floor is allowed up to ½ HP and other floor is up to ¾ HP)

3500 MMK

 

 

(f)

Permission for water pump power increasement up to ½ HP

(for every next ½ HP increasement)

20000 MMK

(10000 MMK)

 

(2)

Charges for Connection Pipe Tapping

 

 

 

(a)

¾"Ø Pipe

2000 MMK

 

 

(b)

1"Ø Pipe

2500 MMK

 

 

(c)

1½"Ø Pipe

3000 MMK

 

 

(d)

2"Ø Pipe

3500 MMK

 

 

(e)

3"Ø Pipe

5000 MMK

 

 

(f)

4"Ø Pipe

25000 MMK

 

 

(g)

6"Ø Pipe

35000 MMK

 

(3)

Penalty Rates

 

 

 

(a)

Penalty for installing water connection without permission

50000 MMK

 

 

(b)

Penalty for destroy/ detach/ change water meter or parts of water meter,  tapping before water meter,  changing water connection pipeline

50000 MMK

 

 

(c)

Penalty for installing water pump without permission

50000 MMK

 

(4)

Prices for water meters

 

 

 

(a)

¾"Ø Pipe

35000 MMK

 

 

(b)

1"Ø Pipe

60000 MMK

 

 

(c)

1½"Ø Pipe

120000 MMK

 

 

(d)

2"Ø Pipe

140000 MMK

 

 

(e)

3"Ø Pipe

190000 MMK

 

 

(f)

4"Ø Pipe

220000 MMK

 

 

(g)

6"Ø Pipe

350000 MMK

 

(C) Regulations for Customers who want to install YCDC Water Connection

  1. Every water connection must be installed water meters.
  2. No person shall illegally repair, detach, destroy, change by any means of water meter installed by the Committee, and no water connection shall be made before water meter.
  3. No person shall install and connect illegal branch pipeline to others from permitted water connection and no person shall sell water to others.
  4. Water charges must be paid within 10 days after getting Notice of Water Meter Bill. Failure to pay water charges or failure to comply the regulations and guidelines issued by Yangon City Development Committee shall be taken action by disconnecting water supply pipeline.
  5. If the house owner / land owner who uses water with a water connection permit has failed without any reason or refused to allow continuing water use from the existing pipeline to the tenants in that house/ land, Yangon City Development Committee shall take action by disconnecting water supply pipeline.
  6. Every water connection shall have water storage system that should be enough one-and-a-half day for the people living in the building.
  7. Every water connection must be installed electrical water pump with permitted horsepower, and service charges must be paid if electrical water pumps with higher horse power are installed.
  8. The charges of water used during the construction of the building shall be paid with commercial rate, and after the construction, water charges shall be paid according to the categories of water use.
  9. Failure to comply the above regulations will be taken action under existing Yangon City Development Committee Law.
​​​​​​​

Website Address

https://www.ycdc.gov.mm